Archive What's New/Events
| Sr. No. | Title | Published Date | Download/Details |
|---|---|---|---|
| 801 | Design & construction of south side superstructure of Vaiduct over R.B. kadam Marg on Andheri Ghatopar Link Road in Mumbai | Download(24.22 KB) |
|
| 802 | Providing and installing noise barrier along Anik Panjarpole Link Road | Download(163.1 KB) |
|
| 803 | Providing Annual Antitermite Treatment to the Five buildings in ph-I at Truck Terminal Wadala | Download(62.34 KB) |
|
| 804 | Design & Construction of elevated Connector between BKC ‘G’ block and Eastern Express Highway including Construction of ROB on the V.N.Purav Marg at the level crossing near Chunabhatti Railway station | Download(70.98 KB) |
|
| 805 | Tender Notice ED/SKW/MMR/ADVT/13-14 dtd. 01/01/2014. Corrigendum No. : 02 | View Detail | |
| 806 | Queries & Responses post Addendum No.1 for Metro Line 3 for PQ of Civil Contractors | Download(72.75 KB) |
|
| 807 | PQ of Mumbai Metro Line 3. Corrigendum No. : 05 | View Detail | |
| 808 | Advertisement for the post of Dy.L&E.Manager, Lands Surveyor & Surveyor | Download(93.43 KB) |
|
| 809 | Supply, Installation Commissioning of computer Hardware, Software & Peripherals at various MMRDA locations & Buy back of outdated Hardware Inventory | Download(144.71 KB) |
|
| 810 | Repairs to 19 nos. passenger lifts in R & R Colony Ajgaonkar plot, WEH, Jogeshwari (E) | Download(37.19 KB) |
|
| 811 | Shortlisted consortia for General Consultancy of Mumbai Metro Line 3 | Download(27.02 KB) |
|
| 812 | Installation of Security arrangements on the Monorail Phase-1 from Chembur to Wadala. 1. Supplying of X-Ray Baggage Inspection System. 2. Supplying of Hand Held Explosive Detectors. Corrigendum No. : 01 | View Detail | |
| 813 | Installation of Security arrangements on the Monorail Phase-1 from Chembur to Wadala. 1. Supplying of X-Ray Baggage Inspection System. 2. Supplying of Hand Held Explosive Detectors. Addendum No. : 01 | View Detail | |
| 814 | De-silting of Sewer Manholes & SWD line in ‘E’ , ‘G’’GN’,’G-Text’ block of BKC. Corrigendum No. : 07 | View Detail | |
| 815 | Annual routine maintenance work in Bandra Kurla Complex area for the year 2013-14. Corrigendum No. : 06 | View Detail | |
| 816 | Maintenance works in ‘E’, ‘G’, ‘GN’, ‘G-text’ blocks of BKC for the year 2013-14. Corrigendum No. : 05 | View Detail | |
| 817 | 1) Maintenance works in ‘E’, ‘G’, ‘GN’, ‘G-text’ blocks of BKC for the year 2013-14. 2) Annual routine maintenance work in Bandra Kurla Complex area for the year 2013-14. 3) Desilting of Sewer Manholes & SWD line in ‘E’ , ‘G’’GN’,’G-Text’ block of BKC. Co | View Detail | |
| 818 | Supplying of X-Ray baggage inspection system & Hand held explosive detectors at stations of Monorail Phase-1 (Chembur to Wadala) | Download(476.11 KB) |
|
| 819 | Queries & Responses of Invitation for the Pre-qualification of Bidders for Detailed Design and Construction of Underground Stations and Associated Tunnels – Extension of date for submission of Applications (Opens New Window) | View Detail | |
| 820 | Addendum No.1 of Invitation for the Pre-qualification of Bidders for Detailed Design and Construction of Underground Stations and Associated Tunnels – Extension of date for submission of Applications. Addendum No. : 01 | View Detail |



