Archive What's New/Events
| Sr. No. | Title | Published Date | Download/Details |
|---|---|---|---|
| 381 | Allotment of 2 Commercial Plots in G-Block of Bandra-Kurla Complex, Mumbai for 80 years lease | Download(232.83 KB) |
|
| 382 | MMRDA’s Senior Officers for purpose of travelling reservation & booking for official works Tender for supplying of Annual Rate Contract of suppliers are invited to participate in Tendering Process | Download(2.37 MB) |
|
| 383 | Appointment of an agency for the supply of 38 Daily Rated Labourers for the Up-keep and maintenance of Maharashtra Nature Park, Dharavi, Mumbai (E-Tender No. 2680) | Download(242.75 KB) |
|
| 384 | Develop, implement, and support customized Customer Relationship Management software solutions for MMMOCL | Download(67.36 KB) |
|
| 385 | Construction of Cement Concrete Road to approach to Building No. 3 as per Sanctioned DP Plan of SRA Scheme at Bhandary Metallurgy Kurla under Extd MUIP. | Download(190.63 KB) |
|
| 386 | Appointment of Contractor for Construction of Linkway FOB at Metro Line-7 Station – Package 3 - (1) Poisar Metro Station Connecting Samata Nagar | Download(392.27 KB) |
|
| 387 | Operation & Maintenance Parking lot at CS No. 501(Pt.), Near Dharavi Bus Depot, Opp. to Maharashtra Nature Park, Dharavi, Mumbai. | View Detail | |
| 388 | Result for the post of Steno Typist exam held on 8th March, 2019 | Download(716.75 KB) |
|
| 389 | Recruitment for the post of Senior Community Development Officer | Download(850.31 KB) |
|
| 390 | Exam date and syllabus for the post of "Transportation Engineer". | Download(458.26 KB) |
|
| 391 | Notice w.r.t. Declaration of Intention under MR & TP Act, 1966 to prepare Town Planning Scheme for the area of Kalyan Growth Centre. | Download(7.42 MB) |
|
| 392 | Engaging Junior Engineer (Civil/Electrical/Signaling & Telecommunication/Track) | Download(731.47 KB) |
|
| 393 | Invitation for Empanelment of Graphic Designers | Download(185.07 KB) |
|
| 394 | Result for the post of Telephone operator | Download(350.62 KB) |
|
| 395 | Result for the post of Dy.Accountant | Download(1.11 MB) |
|
| 396 | Engagement of ‘Detail Design Consultant’ (DDC) and 'General Consultant' (GC) respectively for Metro Line-5 Thane-Bhiwandi-Kalyan of Mumbai Metro Rail Project of MMRDA, Mumbai | Download(38.18 KB) |
|
| 397 | Result for the post of Executive Engineer, Dy. Engineer-I, Jr. Engineer of Signalling & Telecommunication, Electrical and Track. Exam Dt. 22.12.2017 | Download(297.79 KB) |
|
| 398 | Declaration of Intention to add the rest of the area of Kalyan Growth Centre in Town Planning Scheme No. 1 (TPS No.1) | Download(7.4 MB) |
|
| 399 | A)NIT No. MMRDA/MMRP/CA-15A: Part Design, fabrication, supply and erection of pre-fabricated steel roof structure including entry and exit structures at 06 Stations [Andheri(East), Shankarwadi, JVLR Junction, Mahanand, Aarey & Pathanwadi] of Andheri(East) | Download(46.95 KB) |
|
| 400 | Declaration of Intention for Town Planning Scheme No. 1 (TPS No. 1) located within the Kalyan Growth Centre (KGC) | Download(1.86 MB) |



