Archive What's New/Events
| Sr. No. | Title | Published Date | Download/Details |
|---|---|---|---|
| 601 | Garden Maintenance Contract for MMRDA’s New Office Building, NaMTTRI Building, Jetwan Building & Existing Office Building in ‘E’ Block of BKC and Cr-2 Office at Namriman Point | Download(52.24 KB) |
|
| 602 | Mechanized and manual Cleaning (Housekeeping) for MMRDA’s residential building situated in ‘E’ Block of BKC | Download(51.43 KB) |
|
| 603 | Mechanized and manual Cleaning (Housekeeping) for MMRDA’s residential building situated in ‘E’ Block of BKC | Download(58.26 KB) |
|
| 604 | Providing Manpower for the building maintenance purpose in Maintenance Cell of Engineering Division of MMRDA-For the year 2015 to 2017 (2nd Call) | Download(50.62 KB) |
|
| 605 | Mechanized and manual Cleaning (Housekeeping) for MMRDA’s office building situated in ‘E’ Block of BKC and office premises situated at Cr-2 (Nariman Point), Balkum (Thane). | Download(57.78 KB) |
|
| 606 | 1) Supplying day to day materials and electrician for maintenance of Electrical installation at MMRDA office Building at BKC, Bandra (E), Nariman Point, Thane, Kalyan & Residential Buildings in Mumbai & Navi Mumbai for 3 years (2015-2018). 2) Providing se | Download(50.15 KB) |
|
| 607 | Providing Manpower for the building maintenance purpose in Maintenance Cell of Engineering Division of MMRDA (For the year 2015 to 2017) | Download(49.47 KB) |
|
| 608 | Standard Set of Deviations to RFP for “Selection of Master System Integrator for Design, Development, Implementation, Operation and Maintenance of Smart BKC 1.0 Initiatives for Bandra Kurla Complex, Mumbai”. Corrigendum No. 02 | View Detail | |
| 609 | Appointment of Consultant for obtaining Forest Clearances for proposed Airoli-Katai Naka Highway Project. Corrigendum No. 01 | View Detail | |
| 610 | Notice inviting tender for design / development of short duration Walkthrough videos on Mumbai Metro Line – 3 | Download(276.77 KB) |
|
| 611 | RFP for design / development of short duration Walkthrough videos on Mumbai Metro Line – 3 | Download(1.04 MB) |
|
| 612 | 1) Providing Maintenance to Electrical installation in Ph-I of Truck Terminal Wadala for 3 years (2015-2018). 2) Providing comprehensive type annual maintenance of 6 Nos. (Six) lifts at Wadala Truck Terminal for 1 year (2015-2016). (Second Call) | Download(33.18 KB) |
|
| 613 | Preparation of Comprehensive Redevelopment Action Plan for affected buildings located at Kalbadevi and Girgaon Mumbai Metro Line-3 Stations | Download(46.57 KB) |
|
| 614 | INVITATION OF TENDER FOR HIRING OF OFFICE PREMISES IN THE VICINITY OF NARIMAN POINT, MUMBAI. | Download(397.22 KB) |
|
| 615 | Hiring of Consultancy Services for Design, Detailed Engineering, Proof Checking, Supervision and DLP Supervision for the work of Development of D.P.Roads, Providing and Laying of Water and Sewer Mains at Oshiwara District Centre (ODC) and Construction of | Download(31.56 KB) |
|
| 616 | Repairs to internal drainage line on urgent basis at Piramal Holdings R&R colony, Kanjurmarg (W). | Download(56 KB) |
|
| 617 | Global Invitation for Request for Proposal (RFP) for Planning, Detailed Engineering Design and Bid Process Management for Elevated Bus Rapid Transit System (BRTS) from Bandra to Dahisar | Download(1.14 MB) |
|
| 618 | Rental Valuation of Properties Located at Bandra Kurla Complex and CR2, Nariman Point, Mumbai (Re-Tender) | Download(69.86 KB) |
|
| 619 | Providing Project Management Consultancy Services For supervision and DLP supervision of Widening and Improvement of Road from Forest Naka to Badlapur MIDC (SH-35) from KM. 92/500 to 98/590. Corrigendum No. 01 | View Detail | |
| 620 | 1) Repair & upgradation of Internal Sewer lines in premises of Kukreja ph-I & ph-II at Vashi Naka, Chembur. 2) Replacing existing damaged pipes with uPVC pipes and applying water proofing paint to Diwan buildings at Vashi Naka, Chembur. | Download(50.96 KB) |



