Archive What's New/Events
| Sr. No. | Title | Published Date | Download/Details |
|---|---|---|---|
| 641 | Repairs to H.M.Road & M.A.Road connecting GTB Nagar station to Antop Hill station | Download(38.05 KB) |
|
| 642 | Widening and Improvement of Neral-Dasturi Road SH-109 (2nd Call) | Download(59.15 KB) |
|
| 643 | Appointment of Consultant for formulating Policies and Rules for disposal of Debris/Silt (C and D) waste in MMR. Corrigendum No. 02 | View Detail | |
| 644 | CTS updation study: Extension of proposal due date | Download(25.58 KB) |
|
| 645 | Tender No. 155 - Widening and improvement of road from Forest Naka to Badlapur MIDC (SH-35). Corrigendum No. 02 | View Detail | |
| 646 | PROJECT MANAGEMENT CONSULTANCY SERVICES FOR THE WORK OF WIDENING AND IMPROVEMENT OF NERAL–DASTURI ROAD SH-109. Corrigendum No. 02 | View Detail | |
| 647 | Lowering down the sign board installed on block-II terrace of MMRDA office building | Download(22.93 KB) |
|
| 648 | Balance work of Retaining wall and Service Road along the bank of Mithi River and Vakola Nalla | Download(102.53 KB) |
|
| 649 | Raising of Existing compound wall at Ajgaonkar Plot, Jogeshwari (E) | Download(41.7 KB) |
|
| 650 | Appointment of consultant for formulating “Policy and Rules for disposal of Debris/Silt (C & D Waste) in Mumbai Metropolitan Region (MMR) | View Detail | |
| 651 | Annual rate contract for toner and cartridge | Download(41.75 KB) |
|
| 652 | Notice published on 25th July 2015 regarding Potholes in MMR | Download(124.3 KB) |
|
| 653 | MMRCL Recruitment 2015 (Phase-3) | Download(555.8 KB) |
|
| 654 | MMRCL Recruitment 2015 (Phase-2) | Download(416.86 KB) |
|
| 655 | MMRCL Recruitment 2015 (Phase-1) | Download(133.7 KB) |
|
| 656 | Implementation of Enterprise Web GIS Solution in MMRDA-Technical Presentation Notice | Download(349.17 KB) |
|
| 657 | "Planning, Detailed Design, Engineering and Bid process management for Elevated BRTS from Bandra to Dahisar” – Termination of Bidding process for Appointment of Consultants | Download(67.99 KB) |
|
| 658 | Pre-Bid Meeting Minutes of Preparation of the Comprehensive Redevlopment Actino Plan for Kalbadevi and Girgaon station on Mumbai Metro Line 3 Through Redevlopment of Existing Affected Buildings | Download(2.64 MB) |
|
| 659 | Construction of the Anik Panjarpole Link Road. - Desilting of Storm water Drains | Download(108.24 KB) |
|
| 660 | Mumbai Monorail : Dewatering arrangement for monsoon 2015 | Download(49.91 KB) |



