inner-banner

Archive Tender & Notices

Archive Tender & Notices
Sr. No. Tender Reference No. Division Type Title Date of Issue End Date
141 Administration Notice प्राधिकरणाच्या जुन्या इमारतीमधील 400 विस्तारीत दूरध्वनी आणि थेट दूरध्वनींचे दुरूस्ती व देखभालीचे तसेच कराव्या लागण-या वायरिंगसाठी वार्षिक कंत्राट करणेबाबत. (81.87 KB)प्राधिकरणाच्या जुन्या इमारतीमधील 400 विस्तारीत दूरध्वनी आणि थेट दूरध्वनींचे दुरूस्ती व देखभालीचे तसेच कराव्या लागण-या वायरिंगसाठी वार्षिक कंत्राट करणेबाबत.
142 Admin (unit-4) Administration Notice Regarding EPBAX Annual Maintenance and Repair contract in New MMRDA Building (1 year rate contract) (93.99 KB)Regarding EPBAX Annual Maintenance and Repair contract in New MMRDA Building (1 year rate contract)
143 Admin/Unit-1/MMRDA. Administration Notice Purchase of New Vehicle (49.7 KB)Purchase of New Vehicle
144 IT Cell Corrigendum Appointment of Implementing Agency for Designing, Development, Implementation & Maintenance of Infrastructure Project Management Platform for MMRDA (89 KB)Appointment of Implementing Agency for Designing, Development, Implementation & Maintenance of Infrastructure Project Management Platform for MMRDA
145 2024_MMRDA_1037970_1: CA-253 Metro PIU Corrigendum CA-253: Appointment of Consultant for peer review of Feasibility, Detailed Project Report, Bid Documents and Concurrent Evaluation of various project under MMRDA. (572.14 KB)CA-253: Appointment of Consultant for peer review of Feasibility, Detailed Project Report, Bid Documents and Concurrent Evaluation of various project under MMRDA.
146 Metro PIU Corrigendum System Package 2 CA-233: Design, manufacture, supply, installation, integration, testing, commissioning, and maintenance of power supply, traction, E&M, lifts, and escalators for Mumbai Metro Line 6. (56.89 KB)System Package 2 CA-233: Design, manufacture, supply, installation, integration, testing, commissioning, and maintenance of power supply, traction, E&M, lifts, and escalators for Mumbai Metro Line 6.
147 Metro PIU Corrigendum Design, manufacture, supply, installation, integration, testing, commissioning, and maintenance of rolling stock, signaling, telecommunication, platform doors, and depot systems for Mumbai Metro Line 6. (56.78 KB)Design, manufacture, supply, installation, integration, testing, commissioning, and maintenance of rolling stock, signaling, telecommunication, platform doors, and depot systems for Mumbai Metro Line 6.
148 IT Cell Corrigendum Appointment of Implementing Agency for Designing Development Implementation and Maintenance of Infrastructure Project Managemen (89.34 KB) Appointment of Implementing Agency for Designing Development Implementation and Maintenance of Infrastructure Project Managemen
149 Town Planning Corrigendum Appointment of Architectural and Project Management Consultancy for Slum Rehabilitation Scheme under reg.33(10) of MCGM DCPR-2034 at Ramabai Ambedkar Nagar, Ghatkopar (East) on plot bearing CTS No. 194(pt) and 195 (pt) in Mumbai". (743.2 KB)Appointment of Architectural and Project Management Consultancy for Slum Rehabilitation Scheme under reg.33(10) of MCGM DCPR-2034 at Ramabai Ambedkar Nagar, Ghatkopar (East) on plot bearing CTS No. 194(pt) and 195 (pt) in Mumbai".
150 IT Cell Corrigendum Appointment of Implementing Agency for Designing Development, Implementation and Maintenance of Infrastructure Project Management Platform for MMRDA (88.97 KB)Appointment of Implementing Agency for Designing Development, Implementation and Maintenance of Infrastructure Project Management Platform for MMRDA
151 IT Cell Corrigendum Appointment of System Integrator SI agency for Implementation support of ERP GIS 5D BIM CDE and Analytical tools for MMRDA (89.44 KB)Appointment of System Integrator SI agency for Implementation support of ERP GIS 5D BIM  CDE and Analytical tools for MMRDA
152 IT Cell Corrigendum Appointment of Implementing Agency for Designing Development Implementation and Maintenance of Infrastructure Project Management Platform for MMRDA (89.3 KB)Appointment of Implementing Agency for Designing Development Implementation and Maintenance of Infrastructure Project Management Platform for MMRDA
153 Metro PIU Corrigendum Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6 (455.7 KB)Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6
154 Metro PIU Corrigendum Design Manufacture Supply Installation Integration Testing and Commissioning of Rolling Stock Communication Based Signaling and Train Control Telecommunication Platform Screen Doors Systems and Depot Machinery and Plant including 15 Years of Comprehen (260.88 KB)Design Manufacture Supply Installation Integration Testing and Commissioning of Rolling Stock Communication Based Signaling and Train Control Telecommunication Platform Screen Doors Systems and Depot Machinery and Plant including 15 Years of Comprehen
155 Mono-PIU Notice Revised Tender Schedule for the tender Appointment of Operator for O and M of Mumbai Monorail From Sant Gadge Maharaj Chowk to Chembur (148.5 KB)Revised Tender Schedule for the tender Appointment of Operator for O and M of Mumbai Monorail From Sant Gadge Maharaj Chowk to Chembur
156 Town Planning Notice Appointment of Architectural and Project Management Consultancy for Slum Rehabilitation Scheme under reg 33 10 of MCGM DCPR 2034 at Ramabai Ambedkar Nagar Ghatkopar East on plot bearing CTS No 194 part and 195 part in Mumbai (272.3 KB)Appointment of Architectural and Project Management Consultancy for Slum Rehabilitation Scheme under reg 33 10 of MCGM DCPR 2034 at Ramabai Ambedkar Nagar Ghatkopar East on plot bearing CTS No 194 part and 195 part in Mumbai
157 IT Cell Corrigendum Appointment of System Integrator SI agency for Implementation support of ERP GIS 5D BIM CDE and Analytical tools for MMRDA (291.06 KB)Appointment of System Integrator SI agency for Implementation support of ERP GIS 5D BIM  CDE and Analytical tools for MMRDA
158 Mono-PIU Notice Revised Tender Schedule for the tender Appointment of Operator for O and M of Mumbai Monorail From Sant Gadge Maharaj Chowk to Chembur (148.53 KB)Revised Tender Schedule for the tender Appointment of Operator for O and M of Mumbai Monorail From Sant Gadge Maharaj Chowk to Chembur
159 Town and Country Planning Corrigendum RFP for Selection of System Integrator SI for Design Development and Implementation of Regional Information System for Mumbai Metropolitan Region and Urban Observatory at Mumbai Metropolitan Regional Development Authority Mumbai (284.33 KB)RFP for Selection of System Integrator SI for Design Development and Implementation of Regional Information System for Mumbai Metropolitan Region and Urban Observatory at Mumbai Metropolitan Regional Development Authority Mumbai
160 Metro PIU Corrigendum Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6 (674.41 KB)Design Manufacture Supply Installation Integration Testing and Commissioning of Power Supply and Traction E and M Lifts and Escalators Including 15 Years of Comprehensive Maintenance After 2 Years of Defect Liability Maintenance Period of Line 6
×

Rate Your Experience